
2 – the bottom bolts of fastening
Removal
PERFORMANCE PARTS ORDER
1. To disconnect a wire of weight from the accumulator, and also a socket of multicontact connection behind the generator (after removal of a safety fastener).
2. To weaken bolts of fastening of the generator.
3. To turn the generator to the engine and to remove wedges a belt from a generator pulley.
4. To unscrew bolts of fastening and to take the generator.
No comments:
Post a Comment